Understand the cost.
Then consider the return.
Explore the total cost of contributing a GPU: hardware, electricity, availability, accepted work and other operating costs. Enter your own costs and compare the scenarios.
What could a week look like?
A compatible mid-range GPU placed in the proposed Performance tier, doing 20 accepted hours in a week at A$0.80 an hour, would gross A$16.00 before costs.
Assume 40 powered-on hours: 20 accepted hours, 1 unpaid retry hour and 19 idle hours. At 250 W for the whole machine while processing, 50 W while idle, and A$0.30/kWh, electricity would cost A$1.86 (6.2 kWh).
That leaves A$14.14 before hardware cost, cooling, bandwidth, fees, maintenance and tax. These are example inputs, not measured hardware specifications or a forecast. A GPU with no accepted jobs has no gross compensation.
Change every assumption in the full cost calculator →Gross income is only the beginning.
Only accepted productive hours receive the proposed provider rate. Unpaid processing and idle time still consume electricity.
Hardware depreciation spreads the allocated purchase/current value minus expected resale over its entered useful life. It is an economic allowance, not tax depreciation advice.
Operating-cash payback divides allocated upfront cost by the monthly remainder after operating costs. It excludes resale. ROI over useful life includes that assumed resale and repeats the same monthly cash scenario for the entered period.
Electricity = (processing hours × processing watts + idle hours × idle watts) ÷ 1,000 × tariff. Provider rates already exclude the platform’s planned retained share; it is not deducted again here.
Tax, GST treatment, changes in rates or demand, equipment failures, and costs you leave at zero are not modelled. Actual hardware may have different processing and idle power. No purchase recommendation is made.
Register provider interest →Compare tiers using the same inputs.
Power and all other assumptions stay identical across these rows for comparison. Change the inputs for each actual machine; higher-tier hardware may cost more and draw more power.
| Tier | Customer processing subtotal | Provider gross | Provider total cost | Provider remainder |
|---|